— Services

End-to-end, with restraint.

Three disciplines, one team. From the first conversation with a landowner to the final handover, work passes between people who already know one another.

— At a glance

Three services. One programme.

Land acquisition
01
Land acquisition
— No. 01

Under-utilised land, quietly identified

01

Land acquisition

Off-market option agreements with landowners.

Fig. 01 — Indicative site plan

Deliverables
  • 01Initial site appraisal — planning history, constraints, indicative GDV
  • 02Direct landowner introduction and negotiation
  • 03Heads of terms in plain English
  • 04Option agreement legal work, paid by us
  • 05Deposit on signing; balance on grant of planning
Specification
Engagement
Option agreement
Term
18–24 months
Landowner cost
Nil
Site type
1–3 dwellings
Geography
United Kingdom
Planning & design
02
Planning & design
— No. 02

Drawings, models, the patient work of design

02

Planning & design

In-house architecture and consents work.

Fig. 02 — Schematic ground floor

Deliverables
  • 01Pre-application meeting with the local authority
  • 02Concept design responding to the planning brief
  • 03Heritage, ecology and arboriculture reports as required
  • 04Full planning application and management to determination
  • 05Discharge of conditions ahead of build
Specification
Stage
RIBA 0–4
Submission
6–9 months
Determination
8–13 weeks
Authority visits
In person where it matters
Output
Approved drawings + conditions
Delivery
03
Delivery
— No. 03

Measured, considered, on programme

03

Delivery

Build management with vetted contractors.

Fig. 03 — Construction section

Deliverables
  • 01Tender to a curated shortlist of contractors
  • 02Full technical drawings, schedules and specifications
  • 03Weekly site supervision and progress reporting
  • 04Snagging, handover and aftercare programme
  • 05Photography of the completed home
Specification
Stage
RIBA 5–7
Programme
14–18 months
Supervision
Weekly minimum
Contractor panel
By invitation
Aftercare
12 month defects period
— Fees

How we are paid.

Two models. Choose what fits the engagement.

Model A

Option-acquired site

Share of the uplift between agricultural value at signing and planning-grant value on determination. Landowner share fixed in the option.

Upfront cost to landowner
Nil
Our payment
On grant only
Risk carried
By us
Model B

Third-party brief

Landowner commissions us to obtain consent without an option arrangement. Fixed fee with milestone payments. No contingency, no scope creep.

Fee structure
Fixed, milestone-based
Scope
Defined upfront
Risk carried
Shared
— Specialist network

Drawn in only when the site asks for it.

We carry the core disciplines in-house. The rest is brought in by invitation — long-standing relationships with specialists who match our standards and don’t pad their hours.

01Planning consultancyPre-app strategy and DCO advice→
02ArchitectureConcept and technical design→
03Heritage advisorConservation and listed contexts→
04Structural engineerFoundations and frame design→
05M&E consultantBuilding services and Part L→
06Landscape architectSetting and ecological mitigation→